Skip to product information
1 of 1

CBCT Compliance

New York State CBCT Compliance Guide (2026 Edition)

New York State CBCT Compliance Guide (2026 Edition)

Expert Review in Progress

A state-specific execution manual for New York dental practices outside the five boroughs that are purchasing, installing, or operating a cone beam CT system. The guide follows the project in the order the practice actually encounters it—from medical-physicist engagement and room planning through installation, acceptance testing, registration, operator authorization, first-patient readiness, recurring QA, and inspection control.

The New York State compliance model

Outside New York City, dental CBCT facilities are regulated through the New York State Department of Health, Bureau of Environmental Radiation Protection. Installation does not by itself authorize clinical use. Before patient operation, the practice should have current registration, completed commissioning and medical-physicist acceptance work, trained and authorized operators, and an active written QA and radiation-safety program.

New equipment also creates a separate inspection workstream. The practice must identify whether its dental facility is inspected by NYSDOH, a county, or a CRESO and arrange the required new-equipment inspection. The medical physicist’s acceptance-testing report and the state, county, or CRESO inspection are related but distinct records.

What the New York State guide covers

  • Nine-step purchase-to-operation compliance roadmap
  • Statewide jurisdiction guidance for practices outside the five boroughs
  • Project Paths A–C for pano replacement, unused rooms, and construction projects
  • New York State-licensed medical physicist selection and scope guidance
  • Pre-installation room, shielding, operator-position, scatter-data, and workload review
  • Power, network, observation, delivery, furniture, and building-access readiness
  • Installation-day commissioning, operator training, source documents, and FDA Form 2579 closeout
  • Medical-physicist acceptance testing and room/radiation-protection conclusions
  • Separate NYSDOH, county, or CRESO new-equipment inspection pathway
  • Registration workflow for new and established radiation facilities
  • DOH-2126 old-unit disposition workflow and closure records
  • Dentist, hygienist, and dental-assistant operator requirements
  • Qualifying CBCT training and direct-supervision requirements for dental assistants
  • Facility-specific written QA manual and radiation-safety procedures
  • First-patient readiness gate, pre-use QA, protocol control, and ALARA workflow
  • Recommended CBCT patient logbook and inspection-ready recordkeeping
  • Manufacturer QA procedures, physicist baselines, failures, corrections, and retesting
  • Registration billing, recurring QA, training, service, and inspection-cycle controls
  • Day 1 Radiation Master Binder and digital inspection-readiness system
  • Done-for-you checklists, QA tools, operator records, notices, calendars, and provider-directory framework
Publication status

The New York State editorial draft is complete and undergoing independent technical review. The final 2026 edition will be released after expert review and final primary-source re-verification.

View full details

2026 State Guide

Join the New York State release list

Receive the publication notice, final table of contents, and founding-edition pricing when the reviewed New York State guide is ready. No general newsletter enrollment is required.

New York State guide updates only. You may unsubscribe at any time.

How these guides are developed

CBCT Compliance was developed from more than a decade of experience within the dental imaging industry and direct exposure to the practical gaps that arise between equipment purchase, installation, registration, training, quality assurance, and inspection readiness.

Each state guide is built from primary-source regulations, agency forms, official guidance, published fee schedules, and documented compliance procedures. The material is organized into the chronological sequence a dental practice is likely to encounter when acquiring and operating a CBCT system.

Editorial conclusions are not sponsored or controlled by any equipment manufacturer, distributor, lender, or listed professional-service provider. Draft editions undergo independent technical review and primary-source re-verification before final publication.

For informational and educational purposes only. The guide does not constitute legal, regulatory, medical-physics, or other professional advice. Practices should verify current requirements with the applicable regulatory agency and appropriately qualified professionals.